Planning & Development Status
•Pre-planning studies
–Coastal & Geologic studies - completed
–Geotechnical Investigation - on-going
•Planning
–Site Development plan - completed
–Engineering Design - on-going
–Coastal Design - on-going
–Marketing Area - for finalization
•Model Unit
•Docking Facility
•Multi-purpose Hall
•Picnic Area
–Amenities Plans - for finalization
•Clubhouse
•Gate & Guard House
Product Concept •Residential
–Only 400 lots at 1,000 sqm average lot cut
–Only 20% of the lot is build-able
•80% will be retained as “green”
•“gentleman’s farm”
–Exclusive; low density ( approx. 7 lots per hectare)
Product Offering / Amenities
•Subdivision features
–concrete roads with street lights
–side walk
–electrical connections
–water connections
–1.5 m concrete + 3 strands barbed wire perimeter fence
– gate & guardhouse
–Landscaping
–combined storm drainage system and sewage line
–sewage treatment facility